John Company

Gemini 5 Technical Debriefing, Part I, 1965

NASA-UAP-D019 · page 167 of 223

Page 167 of 223 of NASA-UAP-D019

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

162
Conrad
Cooper
FCSD REP
Cooper
FlDENTIA
One and a half orbits.
We really aline•d in about one
and a half orbits.
We powered up two and one half and thei:. actually,
we were actual ly alining for about an crbit and a
half before retrofire.
And we were on all the aline­
ment and everything was done on the RCc system.
How about the preretro checklist?
Let me say this on this alining.
We fcund t hat we
coul dn't even see any decrease at all jn RCS after an
orbit and a half. The way we were doirg this we were
doing it i n Horizon Scan BEF then using· the Rllse MJde
in the H')rizon . Scan.
To really keep tl:.ose needles
real ly closely centered.
Now, you can do the same
thing in Tu.lse BEF, -but the Ibrizon Scan if you ne­
glect it for just a minute, the lbrizon. Scan would
hold it in there real closely and wouldn't let you
wander off anywhere in pitch.
00 F-t0E-N:f:t~L
....