John Company

Gemini 5 Technical Debriefing, Part I, 1965

NASA-UAP-D019 · page 191 of 223

Page 191 of 223 of NASA-UAP-D019

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

186
Conrad
Cooper
Conrad
Cooper
FCSD Rep
Conrad
Cooper
Now , what really hurt there though was that he
sat there at the nominal bank angle of 53 degrees
..
until we got to, say, 2 1/2 g's , which is a fair
.long time through the guidance... .
When he elected
to roll to the 90 degree bank angle, that' s when
we were getting the most lift. Boy, we dug in-­
I 111 tell you we shot up there to 7 1/2 g ' s in
nothing flat. It was at about that time that we
rolled back out again, you see .
We 'd lost the main
lift that we were going to get out of it, but, as
it is, I don't think we did so badly ·Ninding up 83
miles short.
I understand they were targeting
240 miles short .
That's apparently what the load they had in the computer
turned out to be--erroneously put in a.t 240 miles
short .
Yes , they were off by a factor of 240 miles .
So, if we had followed the computer e:icactly we'd
have been a lot further shorter than we were.
Fortunately, we recognized that somet:1ing was amiss.
Did that down-range needle ever do an;rthing?
No, I don ' t think it moved at all,
I don ' t think it ever really moved.
I think one
time it moved a little, but I really don ' t think
ElQENllAt •