Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 196 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
191 FCSD Rep Cooper FCSD Rep Cooper FCSD Rep Conrad day the cross-range needle was indicating properly. The down-range needle, when it came on, stayed in the same place all the time--all the way through? Yes. Full- scale. Full- scale. Right. Just about full-scale on the low range. Okay. How about any of the up-dating done during reentry? We got all the times . We got all the times just fine and I wrote them all down. They gave us enter blackout at 16:14, out of blackout at 21:20, reverse bank at 19:25, bank left 54, and bank right 68. The drogue time was 22+05, and the main time was 23+48 , They were all good times. I had them all written down. No problem. They got the up dates in before blackout and in plenty of time be fore blackout, as a matter of fact . We whistled right in there. No sweat on the times . I guess maybe we went to the 90 degree bank or something like that, but from about the time of lg to the time of guidance locking out, which is roughly 100K and t he altimeter coming· off the peg, man, I don't knov whether it was just because we did it for real