Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 20 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
15 CQ~ElDEhJIJA back and thing was right on the money at about 80 degrees. It was a very smooth transition and then do you remember they were telling, us to look for this one cps oscillation? Well, I didn't have rate needl es like Gordo did, but I wasn't aware of any oscil lations at any time. That booster was in pitch and yaw as far as that went Cooper Those rate needles were like they were glued . There was never through boost or second stage was there ever any rate except that one tiny little rate, one teensy little rate just at when we were in POGO we got one tiny little longitudinal rate, ' just one tiny little fleck on a rate, and was the only one. Otherwise it was just smooth as silk, the whole time, rate wi se . 2.17 Fairing Jettison Cooper Fairing jettison. We jettisoned fairings at 3:25 and man do they ever go. Conrad I counted Gordo down to them. Okay, yes, that ' s a good point . Cooper Beside the scanner fairing and the nose fairing go and when the nose fairing went it went with all kinds of debris . There were pieces flying all