John Company

Gemini 5 Technical Debriefing, Part I, 1965

NASA-UAP-D019 · page 210 of 223

Page 210 of 223 of NASA-UAP-D019

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

205
GGNFIDEf';ITIAL
ON until we were on the water and I gave them three
,.
blood pressures and I don ' t think a:ny of them worked,
I don't think the bowl bled down.
6.12 Post-Main Checklist Items
FCSD REP
Okay, we g-ot the rescue beacon without lights and
the suit fans and ACME BIAS power OFF.
This is
post main check list and landing attitudes.
.,.
E@N~IDENTIAL