Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 215 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
210 Cooper Conrad Cooper Conrad 7. 2 Checklist s Cooper spacecraft 2, 3 hours. As a matter o.f fact the longer we stayed •.the cooler we wi~re getting because we were just sitting back letting - .. We really debated seriously about wait ing if the carrier had been an hour or so nearer we would have waited for a carrier pick up rather than go with the choppers. Because we werei in good shape in theriuand we didn't feel bad and the smells weren't bad and what little RCS fumes where in there from picking them up at 27000 went right out. Of course we had -- let's f ace it thotgh, we had an ideal day on the water. It was like a. mill pond out on the water. It was nice and smcoth and sunny and everything was in good shape, witb t he space craft. I t was early in the morning and the air was about 80 degrees - air t hat it was pulling in the air craft pumping in our· suits, see. But we were in good shape. Check list. I thought our check lists were very good with a few minor things we have m,~ntioned CONFIDENTIAL