John Company

Gemini 5 Technical Debriefing, Part I, 1965

NASA-UAP-D019 · page 218 of 223

Page 218 of 223 of NASA-UAP-D019

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

213
C0~61DENTIA~
well and I guess the guy outside probably couldn't
.,.
see in as well as we could see out.
They were
fogged a little. There were no l ea.ks that we could
tell. Electrical Power, everything was nominal .
o2 was fine.
Conrad
Electrical power, we,we, we, did not power .down the
squib betteries after we got on the water and we
went through the landing check list and powered
down all electrical equipment except the radios and
the beacons and a biomed recorders and the blood
pressure.
Cooper
We took a complete power down check list. We
followed check list right on the money.
Sea condition
was 2 to 3 foot easy swells.
7.6 Post Landing Activity
Cooper
Post landing activities.
Let's see, we proceeded
to continue to try and contact and answer somebody.
We heard all the activity around and over and
around us.
The firs't thing we finatly heard in the way
of communications was when one of the swimmers
plugged in this outside phone jack and talked
to us. He wasn't r eal clear but he was coming
through pretty well.
He wanted to know if we
,,