John Company

Gemini 5 Technical Debriefing, Part I, 1965

NASA-UAP-D019 · page 222 of 223

Page 222 of 223 of NASA-UAP-D019

Text

A machine read this text from the scan. A second reading only partly agreed with it, so it may have mistakes. When the text and the image disagree, the image is right.

3
10
21
25
33
3C
38
44 ←
55 ←
57 RSP SEP
72
81

HF & VHF noise over China

Lte d alt. OK @ 40K & 10.6 K RCS

Pickled drogue @ 70K rather than dual RCS

Time interval between lost 3 retros

Network wired wrong catchup and reentry

Time for cgo = 25 min for coming reentry

Poor clock pit Cond. N.G. for map change

Reticle storage N.G. on map change

Shade pambolic mirror

2 or 3 more rev difficult to change

Diurnal sleep cycle for 7

Need airlock for 0-head handles

Guard for 0-head handles

GMS R10 deadband N.G.

GMS R10 deadband N.G.

Timer on water gun? ammeter

Timer on water gun? failures

4 rehydratable bag (no life vest in ft.)

Harness to restrictive (no life vest in ft.)

Pogo REPORT check

Scanner + comp. check

Scanner + comp. check high

Nose vrow in

Nose vrow in

02 vent caused hi torque

ECS 021