John Company

Gemini 5 Technical Debriefing, Part I, 1965

NASA-UAP-D019 · page 26 of 223

Page 26 of 223 of NASA-UAP-D019

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

21
2. 19 Systems Status
Cooper
System Status everything .. . .
Conrad
We did have ... Let me describe the delta P
\
lights .
Shortly after liftoff I got the number 1
fuel cell delta Plight and I reported i t and just
about t he time I reported it, then the number 2
fuel cell delta Plight came on.
They stayed on
all the way through boost and they were on aft er
insertion for ten, fifteen seconds and after that
they went right back out again and that) i s it.
It didn't effect anything on the fuey e11 operation,
the voltages , /thing stayed fine
• bein
n----tliere was no other way of
telling the~ was out of tolerance so I don 't think
it is a problem.
We expected it.
Cooper
I 'm glad that we had them changed to orange rather
than red .
Conrad
Yeah, yeah.
Cooper
Systems status in addition to that I don ' t think we
had any systems that were exactly right, except
the radio and the acceleration as we had expected
it . We were right on the profile.
SECO was ...
2. 20
SECO
tn currents ,
other than
!Oa!IIAL