Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 26 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
21 2. 19 Systems Status Cooper System Status everything .. . . Conrad We did have ... Let me describe the delta P \ lights . Shortly after liftoff I got the number 1 fuel cell delta Plight and I reported i t and just about t he time I reported it, then the number 2 fuel cell delta Plight came on. They stayed on all the way through boost and they were on aft er insertion for ten, fifteen seconds and after that they went right back out again and that) i s it. It didn't effect anything on the fuey e11 operation, the voltages , /thing stayed fine • bein n----tliere was no other way of telling the~ was out of tolerance so I don 't think it is a problem. We expected it. Cooper I 'm glad that we had them changed to orange rather than red . Conrad Yeah, yeah. Cooper Systems status in addition to that I don ' t think we had any systems that were exactly right, except the radio and the acceleration as we had expected it . We were right on the profile. SECO was ... 2. 20 SECO tn currents , other than !Oa!IIAL