Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 47 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
42 L Conrad Now wait til we get the onboard tapes because the tape recorder was working and this all is on the onboard tape; the conversation that Gordo and I had about that. So we weren' t really sure it was working right but it f wasn't that far off that we were going in the dark- Cooper . Approximately 30 seconds before we had to pitch around or had to yaw around to eject the REP, I had to go back to CAGE and try getting a real rapid P]atform aline in there, SEF and PULSE and I had the neec.les zeroed and we may not have been so far off but you don ' t know. That isn' t enough time to really get it alined. In other words. I had about the time we did it and got there we probably had maybe, 30 seconds to Plat::orm aline. That' s about all we had. Conrad Well, we were just hoping that if it had been pulled off only in pitch why, you know, we ' d get it right--we'd pull the pitch right back in again. Cooper But the scanner was acting up very badly by that time. FCSD Rep How long did you aline the Platform initially? Cooper Initially, we alined the platform for about 15 to 20 minutes and it seemed to aline allright although at that time Pete and I had a discussion right then that we seemed to be alining nose down. ..