Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 51 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
46 Conrad It seems to me we ' ve got some data for them on Primary scanner over the states so they could h~ve it on telemetry, They should be able to find out what happened on that, Cooper Yes, something was really fouled up, I think, Insertion Check List- Conrad We went through it by the numbers , Cooper By the numbers , Thruster and Control Mode Check - we went t hrough by the numbers. Everything was fine . Conrad Well, we were a little bit late, We get a little bit behind and it was about the time when we were late per forming the thruster control mode check because that was supposed to be done before you got to the Canaries and we did it after the Canaries . Cooper That' s right, Conrad We were behind, but we started catchine: up. ,