John Company

Gemini 5 Technical Debriefing, Part I, 1965

NASA-UAP-D019 · page 54 of 223

Page 54 of 223 of NASA-UAP-D019

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

..
FCSD Rep
Conrad
Cooper
Conrad
FCSD Rep
Conrad
Cooper
Cooper
Conrad
We were at the power do':m. on the D- 4 and D- 7.
Oh Yeah.
Well, about that time I think we were
getting back on the Flight Plan.
We got the 16mm
out.
We got the 35mm out.
D- 6 equipment was
Well, it ' s really D-2, it ' s what it was and I had
that work so I decided, "I 'll put together in
pieces at the blob and the camera put together
separately and they had it all loaded with the
right film and everything and had it on the floor,
and we were ready to go . "
Were you pushed for time to do this?
We were right on the money.
We finally caught up
after Canaries and we were on the schedule at
Carnarvon.
Yeah.
We were in good shape at Carvarvon.
Radar test #6, at 01: 30, that worked fine .
We did
bring it on.
It worked.
Observed the transients
on R dot, range and range rate.
6-4 Preretro command
load came out fine .
Blood pressure on the Command
Pilot there past Carnarvon, let's see.
Now that
was back over the Cape here, yeah.
No , you broke the O-ring didn ' t you? Right off the
IAL