Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 54 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
.. FCSD Rep Conrad Cooper Conrad FCSD Rep Conrad Cooper Cooper Conrad We were at the power do':m. on the D- 4 and D- 7. Oh Yeah. Well, about that time I think we were getting back on the Flight Plan. We got the 16mm out. We got the 35mm out. D- 6 equipment was Well, it ' s really D-2, it ' s what it was and I had that work so I decided, "I 'll put together in pieces at the blob and the camera put together separately and they had it all loaded with the right film and everything and had it on the floor, and we were ready to go . " Were you pushed for time to do this? We were right on the money. We finally caught up after Canaries and we were on the schedule at Carnarvon. Yeah. We were in good shape at Carvarvon. Radar test #6, at 01: 30, that worked fine . We did bring it on. It worked. Observed the transients on R dot, range and range rate. 6-4 Preretro command load came out fine . Blood pressure on the Command Pilot there past Carnarvon, let's see. Now that was back over the Cape here, yeah. No , you broke the O-ring didn ' t you? Right off the IAL