John Company

Gemini 5 Technical Debriefing, Part I, 1965

NASA-UAP-D019 · page 69 of 223

Page 69 of 223 of NASA-UAP-D019

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

64
in more time on other things.
That something was going to go wrong-~
Conrad
I felt every problem that we had I felt real
good about the fact that we had either the smarts
t o lmow that it was straight forward--
It didn't
take too long to figure out that that h1~ater was
on one line, both heaters, and that we'd had a
single point failure.
And as a mat ter- of - fact we
t ook the schematics out.
Cooper
And there's another argument for our ha-ring it;' for
when it occured there wasn' t anybody around to ask
advice.
Conrad
I t was very straight forward to throw the switches
and look at the amp meter to see whethe:c you were
getting anything out. There was no dou·:it in my
mi nd that it had burned out and the sam,= daml
thing with the thrusters. When we finally decided
we had a problem with them we went through the
ci rcuit breakers just like we did in th= trainer
and it was obvious that number 7 was out and 8
went out and then the rest of them started getting sour.
So, I think that all the training we had we were pretty
well prepared.