John Company

Gemini 5 Technical Debriefing, Part I, 1965

NASA-UAP-D019 · page 80 of 223

Page 80 of 223 of NASA-UAP-D019

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

75
with terrible pulse rates when we ' d hear somebody
calling from down in that deep barrel , Gemini 5,
Gemini 5, Gemini 5. Ha,ha.
Lights on all over the place trying to find the
radio switch. Ha-ha.
Out of a deep sleep.
Cooper
Okay.
I think maybe if we'd just go down through
here and hit these things that particularly-­
Conrad
Tell me where we are in time and then I'll look
in here to see what notes there are in here.
Cooper
Well , and then we left these pretty well as we went
through the flight plan here and then we left
those pretty well-­
Conrad
Well , these are all the next day so-­
Cooper
These things are all ready listed in there--I think
were just mainly the things we wrote in here.
Conrad
These S-6 passes
Cooper
S-6 weather pass at 1 day 6 hours and 10 minutes.
1 day 7 hours 48 minutes 26 seconds.
Sequence
G8, we did that.
That was the hurricane too wasn' t
i t? And then we had another sequence on that -­
the next trip around at 9 hours 22 minutes 49 seconds .
We looked at it again.
Then at 9 hours 27 minutes
33 seconds we had a sequence 208 and that was-­
Conrad
Man, we've got logs for the logs.