Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 237 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
226 It's on the recorder, At 06 days, 08 ·tours, 44 minutes, 40 seconds I did a 418 whic.h was mountains . Those were desert mountaine in East Africa. Again I got some record time. On the seventh dey, 09 hundred hours, 00 minutes , 00 seconds 419 I got the Ascension cali bration except it was done in drifting flight over Carnarvon if I'm not mistaken, And that is the end of D- 4/ D- 7. Updating techniques and communications procedures were exactly the same as covered. Equipment set up and usage was very straightforward. The checkoff list was good. The cooled spectrometer checks worked out fine over Carnarvon. We had a go the first time. We never did make the alinements. The only thing we looked at with the cooled spectrometer was the REP. The REP measurements were mad3 1 hour and 50 minutes after liftoff. We had a go at Carnarvon. I went to PROP GAGE-EXPIDRIMENTS, RAD- 1, Cold IR- ON, IR- ON, power-ON, transmitte::c...oN, ·recorder-OFF. Shortly thereafter we had trouole wi th the scanner. At 2:05 we were still having trouble with the scanner. We were having trouble wi th the platform aline. We were in th,~ process I