Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 238 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
227 of turning and I missed Agena BUS ARM EXPERIMENTS and I missed jettisoning the door on the cold IR. That's my fault and I jettisoned the door on the cold IR at 02 hours , 16 minutes, 15 seconds after liftoff. I started taking the first REP measure ments and unfortunately it was at 2500 feet. I felt that it was still readable so that is where the data starts. We got some black sky along side the REP with the cold IR. The radiometric and IR spectrometer alinements were r ight on the button. So was the cold IR. We had no trouble with the power down procedures. It was very straightf orward. We never did get to do the cryogenic gas lifetime updates. We never got the Milky Wey with that cooled sensor. We did get the void black space with the cooled sensor. We got the Zodiacal light . We got most of the star.measurements . We got the moon. We got the night land measurements. No, well,· we got the numbers that I mentioned. I just don ' t remember all of them. I did not get a:n:y cloud illumination with lightning. I did get dey land measurements. I got the Ascension calibration. I got an IR cloud blanket sweep, but I did not get the cumulus clouds. C~►4EIDEt◄TIAL