Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 239 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
228 ~0t◄ FIDEf~TIAL ' I did get the moon measurements. I did get one mi ssile measurement. I did get one volcano measurement. I did not get the sun measurements. We were in drifting flight then and we never drifted into the sun. The equipment tape recorder shoul d have had by my calculations, which were generous and I think there was probably more left on it than I had calculated, 12 minutes and 40 seconds worth of record time left on it . This says we recorded some 41 minutes worth of data. The voice recorder was used until it broke down. The flight control proced~res were straightforward and we did most of our tracking with the reticle. I ran the equipment. FCSD REP Did missile coordination turn out okay: Conrad It couldn't have been better. 11.3 Synoptic Terrain and Weather Photography Conrad I could sum up this synoptic terrain photography. We have over three hundred photographs. I'm just saying that I think we got some tremendous geological shots. I think we got some great weather shots. I can't say anything al>out it until I see the pictures. We've got them all