Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 105 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
95 with Spacecraft 6 in the air, I thought went very well. It posed no problems. Communications Controls &nd Switches Voice Control Center, Audio modes, Keying and Antenna Selec tion, were all nominal. We might mention in Sleep Configu ration--we never used the Sleep switches bees.use we had the situation where we pretended it was night and went to sleep every evening and the ground never call ed us. I don't think they ever violated that for the 14 days. They never called us during the sleep period. Lovell So that worked very well. Borman Beacon Control was no problem. We didn't use the Reentry C-band Beacon until reentry. The TM controls, tr8Jlsmitter, and antenna again were no problem. It was operated just a.a advertised due to all instructions from the ground. 8.6 Electrical Borman Now we have some interesting things to talk about. Lovell Well, we monitored the electrical system pretty closely. Borma.n Yea.h, I guess we did. Lovell The only thing we can say here is reiterate what we have probably said before. On lift-off we had delta Plights come on for fuel cells--both sections. 1 blinked on and off several times and went off. 2 blinked on and off several times and stayed on through insertion and stayed on