Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 107 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
97 readouts. The ones that are canted inward away from you are hard to read. Bor:ma.n The fuel cell, as Jim said, was an interesting thing. We finally lost stacks 2A and 20 about the 11th or 12th day. stack 2B re.mained on and I'm sure there is a whole history written on the ground of the things they did and tests they ran at McDonnell when we were in the air to see just what they could do and how far they could go with these fuel cells. I thought they did a.n excellent job,and we ended up being able to run them the whole time. As a matter of fact, we turned on our Squib batteries about the 10th day-used the Bua Tie switches and were running entirely on the f'uel cells the latter part of the flight.