Gemini 7 Technical Debriefing, 1965

NASA-UAP-D021 · page 108 of 222

Page 108 of 222 of NASA-UAP-D021

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

98
Borman
The onboard cues for monitoring the el ectrical system are
adequate.
We found out one thing in this f light , t hat is
the Delt a Plight s really don't mean a lot.
We had been
told before the flight never to purge if you had a Delta P
light. We ended up violating every single one of t he ca.r-­
dinal rules that we had.
I think the t hing to note about the entire electrical
syst em was the f ine work done on the ground.
They came up
with solutions. They evidently were running similar type
cel ls at MAC, St. Louis, and they kept them working
f or l onger than they should have.
Fuel cel l operation, as far as I was concerned, Section 1
was i deal. Section 1 maintained its share of the load the
whole flight. Section 2, we lost stacks 2-A and 2-C
event ual l y, I believe on about the 12th day.
I was a
little concerned on the 13th day with the status of Secti on 1
because we had had a delta Plight on Section 1 f or the
first time and we had been running almost 24 hours.
But, t he ground came through and read us up a technical
report from St. Louis that explained the whol e thing.
It
made me feel a lot easier when they did that. Rather than
having t he ground comment blindly on it, "the fuel cells
are going to be good for 24 hours," I would like t o get a