Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 108 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
98 Borman The onboard cues for monitoring the el ectrical system are adequate. We found out one thing in this f light , t hat is the Delt a Plight s really don't mean a lot. We had been told before the flight never to purge if you had a Delta P light. We ended up violating every single one of t he ca.r- dinal rules that we had. I think the t hing to note about the entire electrical syst em was the f ine work done on the ground. They came up with solutions. They evidently were running similar type cel ls at MAC, St. Louis, and they kept them working f or l onger than they should have. Fuel cel l operation, as far as I was concerned, Section 1 was i deal. Section 1 maintained its share of the load the whole flight. Section 2, we lost stacks 2-A and 2-C event ual l y, I believe on about the 12th day. I was a little concerned on the 13th day with the status of Secti on 1 because we had had a delta Plight on Section 1 f or the first time and we had been running almost 24 hours. But, t he ground came through and read us up a technical report from St. Louis that explained the whol e thing. It made me feel a lot easier when they did that. Rather than having t he ground comment blindly on it, "the fuel cells are going to be good for 24 hours," I would like t o get a