Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 109 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
99 Borman little background information on it. How else could we know it was going to be good for 24 hours, and what had they done to prove it would be good for 24 hours? They read it to us over CS~, it eased my mind a lot because I wasn ' t anxious to miss the WASP. On the 13th day, I wanted to be able to go the full 24 hours rather than have to land in the Pacific. So the whole story of the electri cal monitoring, as far as I a.m concerned, was great work by the ground. The main batteries held constant between 22.5 and 22.7 amps for the entire mission, and we checked them once a day at the GO/NO GO stations. When we turned them on ·2 hours before retrofire they carried their share of the load and were operating fine when we were in the water. We turned off the squib batteries about the 10th day and used the bus tie switches. We ran entirely on fuel cell power for the last five days. When the squibs came back on, the voltage was 25.5 after they had been turned off for five days. They operated properly for the last 2 hours of the flight. s.7 Onboard computer During t he l aunch it was absolutely a nominal case. The pitch status, yaw status, and roll status, were zeroed except for a brief period at guidance initiate when they went out about 2 to 3 degrees,and then zeroed. We had no violent