John Company

Gemini 7 Technical Debriefing, 1965

NASA-UAP-D021 · page 150 of 222

Page 150 of 222 of NASA-UAP-D021

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

140
deploy was very nice.
Lovell Ma.in chute deploy, vecy enjoyable to watch.
Borman During landing and recovecy we had the S2F in sight before
we ever hit the water.
11.0 EXPERIMENTS
11.1 Celestial, Space, and Terrestrial Radiometry (D-4/7)
Borman I think we have more valuable data on D-4/D-7 than all the
others put together.
Lovell Right.
Borman Updating techniques and communications procedures were
excellent. Evecything cal led up on D-4/D-7 was right on
the money, including the time and pointing locations for the
reentcy vehicle.
Lovell They did an outstanding job of giving us the right
information onboard.
Borman
We were perfectly trained in equipment setup and usage.
Jim didn't have a question about it. I think there was
no problem at all.
Lovell We got evecything going. I hope that we got some good data.
Borman Cooled Spectrometer checks were nominal.