Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 150 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
140 deploy was very nice. Lovell Ma.in chute deploy, vecy enjoyable to watch. Borman During landing and recovecy we had the S2F in sight before we ever hit the water. 11.0 EXPERIMENTS 11.1 Celestial, Space, and Terrestrial Radiometry (D-4/7) Borman I think we have more valuable data on D-4/D-7 than all the others put together. Lovell Right. Borman Updating techniques and communications procedures were excellent. Evecything cal led up on D-4/D-7 was right on the money, including the time and pointing locations for the reentcy vehicle. Lovell They did an outstanding job of giving us the right information onboard. Borman We were perfectly trained in equipment setup and usage. Jim didn't have a question about it. I think there was no problem at all. Lovell We got evecything going. I hope that we got some good data. Borman Cooled Spectrometer checks were nominal.