Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 151 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
141 I don't know what else to say, as far as we lmow, every thing was perfect, it's all logged, they have the records, they have the TM. Lovell We saw the needle go down when we jettisoned the fairing cover after the fifteen second timer delay, after we did our separation maneuver. I saw the cover go by when we jettisoned. Borman Did you? Lovell It is r ight above the right hand window. Borman I did not see that . The booster measurements were no problem at all. It was ju.st like the wa;y the simulator worked. It was just fine. Very good. We had no problems making the reticle measurements. They were very close to zero on both the IR and the spectrometer. Power- down procedures. Did you have any? Lovell No. Booster background measurements were no problem at all. Borman Okay. The Milky Way measurement without the cooled sensor was performed exactly on t ime. We had no problems with the equipment. No problems with any of this.