Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 34 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
24 Lovell As a .matter of fact, why don't we get out the flight plan. I think we might have a lot of comments on it. Borman Let's start from the beginning. Lovell The recorder was on at 27 .minutes. D-4/D-7 measure.ments. The GET of .measurement that the COLD IR was outside the two degree field of view of the booster was at 30,13. Borman At 40s58 we had 84 %fuel left. We were right on the flight pla.n there. Lovell There was another GET of measure.ment where the spacecraft was lined outside the field of view or the booster at 38:00. Borman We saw the booster for 2 or 3 revolutions after tl:at. The lights were still working. We called it out and t~ ground got readings on this. Lovell The moon and booster were in view at 43:00. The booster and .moon were in view and we might get an erroneous read:tn.g because we were almost on the .moon. Borman Here we have a note that at 2z32 the fuel cell Delta P l i ght blinked off at 2 ftours and 30 minutes and then came back on. That is the section 2 dalta Plight. Lovell Okay, then as far as stowage goes, the ·M-1 cuff was t urned on at 3z03, :Borman We put the bypass hoses on at this time also-- the ECS bypass hoses, Incidentally, they turned out to be not too .m.uch of a problem, They were very handy for the type or