Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 35 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
25 work we did without suits on. Lovell Right. We took the s/c out of the horizon at 2:08 to get some measurements,as requested fro.m DOD,after we measured the stars. This is after we powered down the equipment. We connected the bypass hoses at 2:32. This was 2 hours plus 32 minutes. Lovell Crew status reports. We bad 3 or 4 a day. Borman 5:20,we started unpacking the meals. This is one thing that we had trouble with• lbth left and right food boxes were jam packed. Fortunately ,we changed the lanyards. v,e changed this during our stowage review , <hough it was difficult we got them out. Several of the meals had lost vacuum. Lovell Which .made them more difficult to get out. Borman Really you can't co.mplain about this. The people did the best they could. We had an awful lot of food to store and we were able to get them out. Lovell We had several blinkinge of the Delta Plight during this period. It went out at 6 hours, a littleleas than 6 hours, then came back on again at 6:27. Borman One thing that I wanted to find out a.bout,and I still don't understand,is why we turned on the crossfeed valve right after l&:w\oh. The FC o2 pressure was just on the minit11.Um