John Company

Gemini 7 Technical Debriefing, 1965

NASA-UAP-D021 · page 35 of 222

Page 35 of 222 of NASA-UAP-D021

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

25
work we did without suits on.
Lovell
Right. We took the s/c out of the horizon at 2:08 to get
some measurements,as requested fro.m DOD,after we measured
the stars. This is after we powered down the equipment.
We connected the bypass hoses at 2:32. This was 2 hours
plus 32 minutes.
Lovell
Crew status reports. We bad 3 or 4 a day.
Borman
5:20,we started unpacking the meals. This is one thing
that we had trouble with• lbth left and right food boxes
were jam packed. Fortunately ,we changed the lanyards. v,e
changed this during our stowage review ,
&lthough it was
difficult we got them out. Several of the meals had lost
vacuum.
Lovell
Which .made them more difficult to get out.
Borman
Really you can't co.mplain about this. The people did the
best they could. We had an awful lot of food to store
and we were able to get them out.
Lovell
We had several blinkinge of the Delta Plight during this
period. It went out at 6 hours, a littleleas than 6 hours,
then came back on again at 6:27.
Borman
One thing that I wanted to find out a.bout,and I still don't
understand,is why we turned on the crossfeed valve right
after l&:w\oh.
The FC o2 pressure was just on the minit11.Um