Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 36 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
26 or 150 pai at launch. I called up Houston and said I would like to leave the gauge in the FC02 position rather than the ECS o2 positlon. Chris said, "No, unless we really felt strongly about it, they would rather have it in the ECS o position". So we left it there and after we 2 were inserted and we were still with the booster, they came in with a recommendation that we open the cross feed. When we did, this immediately raised the pressure to 250 psi. The thing that was bad was that we had over 100% o:xygen and we were down to about 100 lbs. on the FC02• We agreed that we would fly at least 50 lbs. above the do.me, So, I really didn't see the need for opening that valve although it didn't cause a:n:y problems. Lovell They wanted to pump up and make sure. Borman It worked fine and we got right back up to 250 lbs. Lovell That is one syste.m that did work fine. Borman The first 7 hours was pretty no.minal. All throughout the flight plan we have notes that the Delta Plight went out and came back on and so on. Bor:man At 16,40 we sighted a satellite .much lower and on a slightly higher inclination path than we were. It passed underneath us. It was so fe:r awa::, it looked like a sighting from the earth. It was just a refiection. We were very religious about the exercise periods. We s-ot