Preliminary Gemini 4 Crew Debriefing, Part I, 1965
NASA-UAP-D016 · page 195 of 340
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
187 White McDivitt we extended it . The way it operates is, it has three positions: EXTEND, OFF, and REI'RACT. I t was in the OFF position and I put it to the EX TEND position . Then I put it back to the OFF position. Periodically, throughout 7-he flight we put it to the EXTEND position and back to OFF to make sure that if it got screwed up the first time that it would go on out. The first extension was supposed to be with the spectrometer-magnetom eter on . So, I checked to see the circuit breakers were on, and they were on. I turned the spectrometer-magnetometer on and then I ex t ended the boom. And in this way the experiment ers hope to get some indication from the lines of force that they were picking up if the thing actually extended at that time . I hope t hey got it . Incidentally, you got a pretty good operation on the swizzle stick, I was asleep and Jim was doing that on my side . That's right . I did it with the swizzle stick way over on Ed' s side. I didn't aline the platform or anything. We were in free drifting flight at this time . As soon as we finished the