John Company

Preliminary Gemini 4 Crew Debriefing, Part I, 1965

NASA-UAP-D016 · page 196 of 340

Page 196 of 340 of NASA-UAP-D016

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

188
McDivitt
Wnite
McDivitt
€01\IFIDENfl~ l-
EVA we went into free drifting flight .
We
powered down the platf orm and the computer, shut
off the attitude indicator lights--we went through
a complete power-down procedure .
We were really
trying to save bettery power, 0AMS fuel , and
everything else we had .
We went on a complete
power-down, down the checklist, and we just
didn ' t have anything on.
And we stayed in this free drifting mode for about
two days .
That right , Ed?
Closer to 2 1/2 days .
Mostly for the first 2 1/2 days we were in a free
dri fting mode .
We didn ' t do the platform aline­
ment and the translation at around 8:10--8: 20 in
the flight plan.
We did not obtain any booster­
star measurements .
As a matter of fact, I'd
like to comment on the booster-star sightings , or
just the booster sightings .
We saw the l ights of
the booster definitely on the first pass as we
were tracking it .
The second pas~ RS Ed sai~
he saw them, and he said he was sure he saw
them because they were flashing .
I was pretty
sure i: saw what he was talking about.
However, this
occurred just at sundown.
Every other time at
COtfftOE~TI~