Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 35 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
I Conrad I've got down here the GMT of liftoff. I wrote down ... 13 plus 59 plus 59 which they l ater change to 14 plus 00 plus 00. I have the one A time they got " it up to us okay, which was 10 pl us 11. Then I have the 2 dash 1 they gave us was 01 pl us 27 plus 16 which they later revised to 01 plus 26 plus 27, I wrote those down. 3.3 Insertion Activities Cooper Okay, l et 's start on inser tion activities. SAFE t he swi tches we did that just right for our check list . In fact , we are even more convinced than ever that a good, thorough, accurate, checklist is the only thing to have and Conr ad Physically marked them off when they "·er e done. Cooper We followed it conscientiously. The sequential light t ests, we did it j ust by the teE.ts. Stowage:; . we already had modified our checklistE, ·and we already had written on some of it that we would do these i f we decided to. For instance, the D- rlng safety pin, we did install them at right t i me, and there was no problem on those; they wer e nruch easi•~r under zero-g to get in and out than we had thought and I had no